Skip to content
Waste Water Construction Permitting

Application Fee Schedule
Wastewater Construction Permits


State regulation 61-30 requires that applications for wastewater construction permits include a fee based on the type of project. A check for the applicable amount must be included with the application package. The fee schedule in the regulation is summarized below:

Collection systems (including interceptors and pump stations)

  • Delegated Review (domestic collection systems and industrial collection/pretreatment systems)

    All Delegated Reviews $75

  • Non-delegated review (based on sewer length)


  • 1,000 feet or less $100
    1,001 feet through 9,999 $200
    10,000 feet or more [or pump station(s) included] $350
    (Note: Fee exempted for individual residential pump stations)

Treatment systems

  • Facilities > 1.0 MGD

    New $1,050
    Expansion $800
    Modification (no expansion) $550

  • Facilities < 1.0 MGD

    New $700
    Expansion $550
    Modification (no expansion) $400

Pretreatment systems

    Simple systems, such as one-component systems (e.g., oil/water separators, air strippers, pH controls, etc.) $200
    Complex systems (such as Multi-Component systems) $600


Bureau of Water . Phone: (803) 898-4300 . Fax: (803) 898-3795 . Contact Us