Superfund Attachments

ASCO Site

  1. Proposed Plan Presentation
  2. Public Meeting Transcript
  3. Proposed Plan

AVX Corporation

  1. AVX Fact Sheet Figure 1
  2. AVX Fact Sheet Figure 2
  3. April 09 Progress Report
  4. May 09 Progress Report
  5. June 09 Progress Report
  6. July 09 Progress Report
  7. August 09 Progress Report
  8. Sept 09 Progress Report
  9. Oct 09 Progress Report
  10. Nov 09 Progress Report
  11. AVX-MB Proposed Plan 110111

Castlebridge Properties Site

  1. Report of Findings
  2. Excuted VCCs
  3. Information and Certification of a Non-Responsible Party VCC
  4. Underground Piping Map-Blueprint
  5. Remedial Investigation Phase I Report
  6. Response to Comments dated 5-7-09
  7. Response to Comments RI Phase I Report Tables 3-6
  8. Well Installation and Groundwater Sampling Report
  9. Monitoring Well Sampling Results
  10. Monitoring Well Installation and Sampling Report
  11. Receptor Survey
  12. Remedial Alternatives Evaluation (Email)
  13. Proposed Plan for Site Remediation
  14. Administrative Record Letter to Library
  15. Memo-Administrative Record
  16. Post Card for Public Comment Period
  17. BLWM Docket as of 3-12-2018

Duke Power - Spartanburg MGP Site

  1. Phase II Interim Removal WP
  2. Final Ecological Risk Assessment
  3. iSOC Pilot Test
  4. Restrictive Covenant
  5. Remedial Alternatives FFS
  6. FFS Addendum Response to Comments
  7. ChemOx Pilot Test Report
  8. ChemOx Pilot Test App A
  9. Chemical Oxidation Pilot Test Report
  10. ChemOx Pilot Test App A-D
  11. ChemOx Pilot Test App E
  12. ChemOx Pilot Test App F-I
  13. ChemOx Pilot Test App J
  14. ChemOx Pilot Test App K
  15. WP for Addtnl Investigation
  16. FS Investigation WP
  17. FFS Work Plan
  18. Focused Feasibility Study
  19. Revised FFS and Comments
  20. Duke Power Spartanburg MGP Proposed Plan
  21. Public Notice Post Card
  22. Admnistrative Record
  23. Newspaper

EFP

  1. EFP February 5, 2008 Public Meeting PowerPoint Presentation
  2. EFP Large Map with One Mile Radius
  3. EFP Proposed Plan--Addendum

IVAX Site

  1. Amendment to Voluntary Cleanup Contract 02-5416-RP

Laurens CeramTec Site

  1. Settling Pond Clean-Out
  2. Potential Hazardous Waste Site Identification and Preliminary Assessment (EPA)
  3. GW and Soil Quality Data Summary Tables
  4. Preliminary Environmental Assessment Report
  5. Lagoon Sampling
  6. Chemical Analysis of Samples Received on 05-09-1989
  7. Cover letter-Copy of Pond Sediment Sampling Enclosed
  8. Lead EP Toxicity, Pond 1, Plant 1
  9. EP Tox Analytical Results from Pond 1, Plant 1
  10. Analysis of Pond Sediment Samples Taken on June 28 1989
  11. Sampling Results Summary for Lead EP Toxicity at Pond 1, Plant 1
  12. Final Draft Report of Phase II Assessment, Volume 1
  13. Final Draft Report of Phase II Assessment, Volume 2
  14. Surface Impoundment Containing TCLP Waste
  15. Conditional Closure Plan Approval for Wastewater Ponds at Plants 1 and 2
  16. Results of Bench Scale Treatability Testing
  17. Executed Consent Agreement #97-029-W
  18. Landfill Closure Plan
  19. Requested Supplemental Information
  20. Review-Closure Plan and Supplemental Information Approval
  21. Installation of Enhanced Surface Water Flow Remedial System
  22. Report of Soil and Groundwater Assessment Activities
  23. Updated Land-Use Survey
  24. Historic Data Review-Plant 2
  25. Historic Hydrogeologic Data Review-Plant 1
  26. Conceptual Site Model, Meeting of July 2, 2015
  27. Laurens Data Gap Investigation Results Meeting Summary
  28. Mardirossian Water Supply Completion Report
  29. Applicable Remedial Technologies (FFS)
  30. FFS, Revision 1 and Response to Comments on FFS dated Sept 2016
  31. 2017 Semi-Annual Progress Report
  32. Review of FFS, Revision 1
  33. Proposed Plan for Site Remediation
  34. Administrative Record to Library
  35. Administrative Record Location Memo
  36. Postcard

SCE&G Fleet Management Site

  1. Remedial Investigation Report 05/01/07
  2. SCE&G Investigation Approval 08/29/08
  3. Removal Action Work Plan 08/07/09
  4. SCANA'S Summary of Supplemental Delineation Activities 04/21/09
  5. DHEC'S Removal Action Memorandum 09/21/09

SCE&G MGP Site

  1. Proposed Plan Final

Stoller Chemical

  1. Proposed Plan for and Amendment to the Record of Decision for OU1 (Groundwater) Dated 1999 with Figure 1 - Site Location Map
  2. Figure 1 - Stoller Site Location Map
  3. Stoller IGWTS Process Flow Diagram
  4. Areal Extent of Cadium Plume IGWTS Pumping OU-1 (2001-2005)
  5. Alternative 3 Pump and Treat Only Aeral Extent of Impacted Groundwater
  6. Alternative 4 SRBR Only Areal Extent of Impacted Groundwater
  7. Alternative 5 Pump and Treat/SRBR Areal Extent of Impacted Groundwater
  8. 2007 RSG Settlement Agreement
  9. 2002 State Agreement SJWG and RSG
  10. Comment 2008 SJWF Statement Agreement

WIX Dillon Site

  1. Soil and Groundwater Analysis Report
  2. Forrest to Clark Verification of Release
  3. Response to DHEC Letter of 12-19-2005
  4. Submittal of Work Plan and QAPP
  5. Review of Work Plan and Monitoring Well Approval
  6. Well Construction Report
  7. Data Report Phase II ESA
  8. Review of Phase II ESA
  9. Response to March 27 Letter
  10. Remedial Option Analysys Groundwater Monitoring Report
  11. Review of ROA and GW Monitoring Report
  12. Remedial Option Assessment
  13. Review of Remedial Option Assessment and GW Rpt
  14. Air-Sparge - Soil Vapor Extraction Piliot Test Work Plan
  15. Review - SVE Well Request SVE-Monitoring Well Approval
  16. Air-Sparge - Soil Vapor Extraction System Design
  17. Additional Environmental Assessment Work Plan
  18. Additional Assessment Work Plan
  19. Review - Remediation Assessment Report and Assessment Plan
  20. Review of RIWP-SAP-HASP
  21. State Register Notice of VCC
  22. Voluntary Cleanup Contract
  23. Response to RIWP Comments
  24. HASP Rev 1.0
  25. Sampling Analysis Plan Rev 1.0
  26. Approval of RIWP SAP Rev 1.0
  27. Remedial Investigation Report
  28. Approval 8-21_RI Report
  29. Focused Feasibility Study and Response to RI Comments
  30. Approval FFS_WP and Response to Comments
  31. RIWP Addendum and ASSVE Evaluation
  32. Approval RIWP Addendum and SVE Evaluation
  33. Revised Schedule - Supplemental RI Activities
  34. Request for Extension to Submit RI Report Addendum
  35. Request to Update Human Health Risk Assessment
  36. Approval RI Addendum Extension
  37. RI Report Addendum
  38. Memo re Updated Risk Assessment
  39. Revised RI Report Addendum
  40. Approval of Revised RI Report Addendum
  41. Focused Feasibility Study
  42. Review of Focused Feasibility Study
  43. Response to FFS Comments and Revised FFS
  44. Approval of Revised FFS
  45. Semi-Annual Groundwater Monitoring Report
  46. Memo to File Establishing AR
  47. Library Ltr re establishing AR
  48. Proposed Plan FINAL
  49. BLWM docket A1-78 as of 4-17-2018
  50. Postcard for Public Notice

Tags

Pollution